My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.03 Rate Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2007
>
11-06-2007 Council Meeting
>
05.03 Rate Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2016 2:08:27 PM
Creation date
11/21/2016 2:08:27 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Plant the assumptions for the Sanitary <br /> Sewer operation. <br /> Other Capital Averages$66,800 per year in 2007 Averages almost$129,400 per year <br /> Improvements dollars, for water system in today's dollars. Includes trunk <br /> improvements,and capital lines,the waste water treatment plant <br /> purchases. and capital equipment. <br /> Costs are inflated 3%annually. Costs are inflated 3%annually. The <br /> The total in today's dollars for 2008 total in 2007 dollars from 2008 <br /> through 2023 is$1,068,500 through 2023 is$2,069,500 <br /> Allocation of Capital improvements needed to Capital improvements needed to <br /> Capital finance water system improvements expand the waste water treatment <br /> Expenses are paid by a combination of hook- plant are paid by a combination of <br /> Between up fees and user fees. Capital hook-up fees and user fees. <br /> equipment and maintenance of the <br /> Current and Capital equipment and maintenance <br /> Future Users existing system is paid by user of the existing system is paid by user <br /> charges. <br /> charges. <br /> After deducting the credit for the After deducting the credit for the <br /> developer,as described in#2 of the developer, as described in#2 of the <br /> Findings section below, Findings section below, <br /> approximately$88,000 in hook up approximately$523,000 in hook up <br /> fees are available to pay for fees are available to pay for <br /> $860,000 of costs of improvements $1,865,000 of costs of improvements <br /> to the water distribution system, to the sanitary sewer system,which <br /> which includes the improvements to includes the improvements to the <br /> the Industrial Park. Industrial Park and the waste water <br /> The study includes a special treatment facility. <br /> assessment component for the The study includes a special <br /> Industrial Park,which is consistent assessment component for the <br /> with the financing for phase I of the Industrial Park,which is consistent <br /> Park. with the financing for phase I of the <br /> Park. <br /> See Exhibit C for the proposed See Exhibit C for the proposed <br /> schedule of capital projects schedule of capital projects <br /> Operating Expenses increase 5%annually. Expenses increase 5%annually. <br /> Expenses Depreciation was revised to reflect Depreciation was revised to reflect a <br /> a longer life than is currently being longer life than is currently being <br /> used to calculate the expense based used to calculate the expense based <br /> on recommendations the City has on recommendations the City has <br /> received from its auditors. received from its auditors.. <br /> Water Utility and Sanitary Sewer Utility <br /> Funding Ideally,a City would fully fund depreciation.in its utility.funds._However, <br /> 3060 Centre Pointe Drive (651)697-8500 Fax:(651)697-8555 <br /> Roseville,MN 55113-1105 http://www.ehlers-inc.com <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.