My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12 - City Clerk Monthly Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2011
>
06-07-2011 Council Meeting
>
12 - City Clerk Monthly Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2014 9:20:04 AM
Creation date
3/19/2014 9:13:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OR <br />Park Board Minutes <br />May 12, 2011 <br />Page 2 <br />banner with black letters and the word "free" in red. It was also decided to <br />see if the City logo could be added to the banner. <br />MOTION CARRIED 4 -0. <br />4. Park Tours <br />The Park tour was cancelled due to cold weather. <br />4.A. Location of Bike Racks <br />Discussion was held regarding the location of a racks. Mayor <br />Adams stated that the bike racks have been er he Commission <br />stated that they could start by placing bik a s at B r Park, the <br />Library, the Cole Memorial Building, an,ai side Pa <br />5. Other Business <br />Karen Ettesvold said that she has receivam <br />surrounding cities. She no that she woul <br />and put together a list of pa ities that <br />during the park tours. She ex i t this <br />decide what we like in the par and <br />The Park Com n felt that t ould <br />plan and the M viewed b e Plan <br />Lew Master Park Plans from <br />time to review the plans <br />i m ission could use <br />co e a way for us to <br />fe is missing in the parks. <br />I <br />e to draft a master park <br />g Commission. <br />Chair Clefne oke UEMW6&pfagarmer's the pos ty of having a community garden. <br />The Mayor bro _ market which would be <br />mmissione ed slWe is ready to begin planning the bushes by <br />ole Memor uildi and the flowers in Bobber Park. Commissioner <br />E Id stated would be willing to assist. Chair Clement asked if the <br />City t Depa ent could water the flowers. Mike Loven stated that <br />they co ate a flowers in Bobber Park. <br />Mike Loven id that he received a bid from Bengston Electric for $1,080 <br />to install electric and lights in the band shelter. <br />Discussion was held regarding funding for finishing the band shelter. The <br />Clerk noted that she would provide a financial report to the Commission at <br />the next Park Commission Meeting. The Commissioners discussed the <br />style of finishing for the walls and the ceiling. It was the consensus that <br />Chair Clement and Commissioner Bruch would work with Mike Loven on <br />the style of finishing and get quotes for the product. <br />
The URL can be used to link to this page
Your browser does not support the video tag.