My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02 - Final Plat Approval Wilderness Resort
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2011
>
05-23-2011 Special Council Meeting
>
02 - Final Plat Approval Wilderness Resort
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2014 11:18:17 AM
Creation date
3/14/2014 11:17:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b. The applicant has submitted a stormwater management plan <br />that is acceptable to the Planning Commission. <br />` c. Condition 3 not applicable to the final plat process. <br />d. The City Attorney has indicated, in a May 9, 2oii letter <br />addressed to Dawn Bittner, that he has reviewed the amended <br />declarations and rental agreement and found them adequate. <br />The Planning Commission has concurred with his finding. <br />e. At the Apri128, Zoii regular meeting, the Planning Commission <br />indicated that the sewer plans need not be reviewed by the City <br />Engineer as they have been prepared by a licensed engineer <br />and are subject to MPCA oversight. <br />f. The applicant has submitted a vegetation enhancement plan <br />that is acceptable to the Planning Commission. <br />g. Condition � not applicable to the final plat process. <br />h. There are no changes to the Association documents previously <br />approved by the City. <br />i. The City has received a copy of the applicants NPDES permit <br />application. <br />j. Conditions io through i9 are not applicable to the final plat <br />process. <br />2. The final plat agrees with the approved preliminary plat. There are no <br />changes to the layout, design, density or general configuration from <br />the preliminary plat. <br />3. The CityAttorney has indicated, in a May g, 2oii letter addressed to <br />Dawn Bittner, that all parties with an interest in the property are <br />properly represented in the final plat documents. <br />4. There are no public improvements or improvements that will <br />�" ultimately become public. Therefore, the City Engineer has not <br />reviewed or commented directly on the final plat. The plans and <br />specifications have been prepared by a licensed civil engineer and, for <br />sanitary sewer, stormwater and erosion control, are subject to review <br />and oversight by the Minnesota Pollution Control Agency. <br />5. The applicant has provided a statement of concurrence from an <br />independent land surveyor. <br />6. A financial security is not required as part of this subdivision. <br />*��**��***� <br />If you have any questions, please do not hesitate to contact me. I can be reached by <br />phone at (866) 900-3064 or by email at or marohnC�communitXgrowth.net. <br />Sincerely, <br />COMMUNITY GROWTH INSTITUTE <br />Charles Marohn, PE AICP <br />� City Planner <br />� � � � � � � � � <br />WWW.COMMUNITYGROWTH.COM ' WWW.STRONGTOWNS.ORG <br />
The URL can be used to link to this page
Your browser does not support the video tag.