Laserfiche WebLink
Attachment Al <br /> Scope of Mitigation Activities Required to be Completed by MnDOT <br /> Relocation of the Pine River Depot <br /> 1. Complete an assessment of the existing site to determine the location of <br /> structural elements related the depot's historic canopy. <br /> 2. Develop a complete set of construction plans and specifications for activities <br /> required to complete the relocation of the depot structure. These plans shall <br /> include the following: <br /> a. Necessary work to stabilize the existing structure for relocation <br /> b. Earth and concrete removal for joist installation <br /> c. Construction of a new building foundation <br /> d. Actual relocation of the structure to the new site <br /> e. As necessary, repair or replace roofing with asphalt shingles <br /> f. Installation of temporary power to the structure at its new location <br /> g. Salvage all original platform pavers and reset them at new site <br /> h. Provide new platform curbing around its perimeter <br /> i. Relocation of existing picnic shelter <br /> j. Replacement of asphalt walkways disturbed by construction <br /> 3. Utilize the plans and specifications to execute a construction project that <br /> successfully relocates the Pine River Depot to the site identified in Attachment <br /> Cl. <br />