Laserfiche WebLink
Attachment B1 <br /> Scope of Mitigation Activities Required to be Completed by MnDOT <br /> Pine River Exterior Restoration Plan Development <br /> 1. Develop a complete set of construction plans for activities required to complete <br /> the exterior restoration of the depot structure. These plans shall include the <br /> following: <br /> a. Repair of trim, siding, soffits, doors, and windows <br /> b. Painting on all exterior surfaces <br /> c. Reconstruction of the depot's historic canopy <br /> d. Installation of a wood shingle roof <br /> e. Construction of replica historic brick chimneys <br /> 2. Present a full set of exterior restoration plans to the new owner in order that <br /> these activities can be completed at a later date. No time limit will be assigned <br /> for the completion of the exterior restoration activities. <br />