Laserfiche WebLink
year or two on the Eagle View parking and drainage issues in order to coordinate with the <br />`-' County on the C.R. 11 project. <br />Discussion was held on issues that will need to be reviewed due to the by-pass in Pequot <br />Lakes. The question of tying in street-scaping, curb lines and sidewalk widths would <br />have to be determined. The study that would be done on County Road 11 would possibly <br />provide some answers to these questions. <br />Tim Bray stated that while the County has a budget of $75,000 for this, he does not see <br />the County paying 100% of the study. He stated that the first step would be to develop the <br />scope of the study and then the cost could be divided up based on a percentage basis. <br />Tim Bray asked those present to submit e-mail addresses of those that each entity would <br />want to add to this committee. It was noted that planning and zoning should have a <br />representative on the committee. <br />It was suggested that each entity consider today's discussion and determine the scope of <br />the involvement needed. <br />� <br />� <br />