Laserfiche WebLink
FROM : C I TY_OF_PEOUOT_LAKES FAX NO. : 2185687229 Feb. 09 2004 05:04PM P4 <br /> 11.A stormwater retention area is planned on site to assist in limiting <br /> stormwater runoff_ <br /> Please note that the City Council also added the following as conditions to the <br /> conditional use permit: copy of their MPCA NPDES <br /> 1. The applicant shall provide the City a s <br /> permit prior to Issuance of a building permit. <br /> 2.. The south parking lot shall be sloped such that stormwater is directed <br /> to the low area on the east side of the property. If this is nch possible, <br /> adequate stormwater retention area will be provided south of the <br /> parking lot to prevent runoff to Derksen Road. <br /> If you have any questions, please feel free to contact me. <br /> Sincerely, <br /> Dawn Bittner <br /> Zoning Administrator <br />