My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11.02 - Government Drive
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2011
>
02-01-2011 Council Meeting
>
11.02 - Government Drive
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2014 3:35:33 PM
Creation date
3/13/2014 3:32:51 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br />February 1, 2011 <br />Pequot Lakes <br />Govemment Drive Proposal <br />Page 3 of 4 <br />office. Unfortunately, with continuing resolutions, the status of this request is on <br />hold. <br />• Public Input Process / Preliminary Layout <br />o We will meet with a Focus Group. <br />The Focus Group members will be determined by the City (a possible list would <br />be finro Council members, a P&Z Commission representative, City Clerk, Street <br />Supervisor, Water & Wastewater Supervisor, City Engineer, and one or finro <br />business people from this corridor). <br />The Focus Group's initial role will be to review draft material and a survey to be <br />presented to the public and properties along the corridor in seeking their input. <br />o We will prepare for and facilitate a First Public Information / Input Session at which <br />we will present a range of pictures of different street and streetscape elements. We <br />will also prepare and hand out a survey. The City will advertise for this. <br />o We will prepare for and facilitate a(breakfast) meeting specifically with property <br />owners along this corridor to cover the same items as the First Public Information / <br />Input Session, including asking them to fill out a survey. The City will send out <br />invitations for this. <br />o We will then meet with the PSZ Commission to seek their input. <br />o After the above three meetings, we will meet with the Focus Group to review the <br />input and surveys received from the above three meetings and funnel down to a <br />proposed improvement layout. This layout may include an altemative for different <br />components. <br />� o We will prepare some drawings / exhibits with the proposed improvement layout and <br />altematives. At this stage we will also prepare a rough cost estimate of these <br />improvements. <br />o We will then meet with the Focus Group to confirm our understanding of and review <br />the information provided to date. <br />At this meeting, we witl also discuss the scope of our efforts for subsequent <br />Design, Bidding, and Construction phases. <br />o We will meet with the City Council to update them on the process and the outcomes <br />of this immediately previous Focus Group meeting. <br />Our estimated cost (this public process is somewhat variable) for the above services is $27,600. <br />Time-wise, we would like to get authorization for this at this City Council meeting so we can <br />move forward on this phase. We a�e hopeful we can have the First Public Information / Input <br />Session before the Fishing Opener so we can do design over the summer and have a final <br />public meeting after Labor Day with the thoughts of possibly bidding in ea�ly 2012. <br />We would submit that we want to keep the process moving forward so we do not risk the City <br />needing to band aid something before a final plan can be implemented. <br />In a brief look ahead, possibly one of the first tasks in the Design phase will be to have a <br />Second Public Information / Feedback Meeting at which we will present the input received in the <br />form of a proposed layout with possibly some alternatives for different components. However, <br />this depends on what the Focus Group believes is the status of the layout. One of the last tasks <br />� for the Design Phase could be a"95% design" Public Meeting at which the near final design will <br />be presented and construction phasing can be discussed. <br />J:WIKTG\Proposals12011 Proposals\- Letter Proposals�Pequot Lakes - Govt Dr - 20110201.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.