My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-18-2001 Planning Commission Meeting
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2001
>
09-18-2001 Planning Commission Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2016 8:58:03 AM
Creation date
10/11/2016 8:57:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Notes from last months meeting. <br /> Questions were raised regarding the correct zoning for the Jack Pine Center and Michael Hurry's property. <br /> The correct zoning should be Commercial. At some point in the future when the new maps are color coded, we <br /> will code these properties as commercial. <br /> Pending an Ordinance Revision, the Planning & Zoning Commission Board acknowledges and allows a <br /> variance from Section 15.16: Pont B. This is the sentence about loading and unloading in the Industrial Park. <br /> (See attached) <br /> Your concerns regarding the lots purchased by Mike Arvig in the Industrial Park were brought to the attention <br /> of Marty Peisch. She stated that she was working on this matter. If you have questions, please direct them to <br /> Marty. <br /> In determining a fee for hauling in grade or fill, the following information was obtained from these cities or <br /> townships: <br /> Nisswa: No charge for normal lots hauling in under 10 cubic yards. If over 10 cubic yards, a Conditional <br /> Use Permit is required. C.U.P. fee is $180.00. <br /> Breezy Point: $50.00 for 10 cubic yards in the Shore land Impact Zone. Residential lots can haul in up to 50 <br /> Cubic yards for $50.00. <br /> Lakeshore: Doesn't charge unless there is a huge amount hauled in. If this is done, a Conditional Use <br /> Permit is required. C.U.P. fee is $200.00 for residential. Lots. <br /> Sibley Township: A $150.00 fee is charged for all sand blankets, dirt and fill. They give $50 to the Soil <br /> Conservation Dept., $50 to their Planning & Zoning Commission and $50 to the Township. <br />
The URL can be used to link to this page
Your browser does not support the video tag.