Laserfiche WebLink
RICKARD, ROBERT <br /> STAFF COMMENTS <br /> page #2 <br /> Section 170-050 Conditional Use Permits. <br /> Any use listed as a Conditional Use in this Ordinance shall be permitted only upon application <br /> to the Zoning Administrator, review and recommendation of the Planning and Zoning Board, <br /> and approval and issuance of a Conditional Use Permit by the Sibley Town Board. The <br /> applicant for a conditional use permit shall fill out and submit to the Zoning Administrator an <br /> Application for Conditional Use Permit When such permit is completed and submitted, the <br /> appropriate fee shall be paid in order for the application to be considered complete and to <br /> receive consideration by the Planning and Zoning Board. A thorough site evaluation shall be <br /> conducted by the Zoning Administrator and the Planning and Zoning Board prior to <br /> consideration of the permit. <br /> A. In considering the granting of any conditional use permit throughout the Township, the <br /> Planning and Zoning Board and Town Board shall evaluate the effect of the proposed <br /> use upon: <br /> 1. The maintenance of the public health, safety and welfare; <br /> 2. The location of the site with respect to existing and proposed access <br /> roads; <br /> 3. Its compatibility with adjacent land uses; <br /> 4. Its compatibility with the intent of the zoning district in which such use is <br /> proposed; <br /> 5. Its compatibility with the objectives of this Ordinance and its consistency <br /> with the Comprehensive Plan. <br /> RECOMMENDED CONDITIONS: <br /> 1. Display area and storage area shall be shown on the site plan. <br /> 2. The PC should specify a maximum number of display units. <br /> 3. 100% screening of all stored RV's for repair from all public roads <br /> 4. Hours of operation should be specified. <br /> 5. No accumulation of debris & rubbish on property <br /> 6. Pole Building not be used for habitation, or other than identified in CUP <br /> 7. Pumping records for Class V injection well be submitted to Sibley Township, with in 10 days <br /> upon pumping. <br /> 8. Acquire MPCA and EPA permits for disposal of oils, antifreeze, solvents etc, toxic <br /> wastes. All permits be current and on file with Sibley Township. Recycle and management <br /> plan be on file with the Township. <br /> 9. CUP permit be reviewed in 3 years. <br /> 10. Permit be acquired from MN DOT and ingress/egress be completed and approved prior to <br /> issuance of Sibley Township CUP. <br /> 11. Any conditions not adhered to will automatically null and void the CUP. <br /> 12. Handicap parking and building entry area be of bituminous surfacing or equal. <br /> 13. All plans shall comply with Sibley Township Ordinance <br /> 14. Comply with all conditions of the Building Permit prior to issuance of CUP. <br />