My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06 - Planning and Zoning Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2011
>
02-01-2011 Council Meeting
>
06 - Planning and Zoning Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2014 3:34:35 PM
Creation date
3/13/2014 3:32:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�- PUBLIC HEARINGS: None. <br />ADDITIONS OR DELETIONS TO AGENDA: <br />Add under New Business — SuperValu Platting. <br />OPEN FORUM: Discussed earlier. <br />NEW BUSINESS: <br />SuperValu Platting: <br />Mr. Marohn explained the original site layout and the platting requirement condition. <br />WSN is asking what we are going to require. He stated he would like to see a <br />Preliminary Plat and Final Plat and do them at one meeting. The Planning Commission <br />had wanted to see the locations and the final numbers for impervious coverage and the <br />setbacks to verify the lot created meets the requirements. WSN is requesting to not do <br />the Preliminary Plat and to just do a Final Plat, based on the submitted proposal, not an <br />as-built. The Preliminary Plat based on the proposed layout is cheaper and quicker. <br />If we insist on an as-built for Preliminary Plat we will need to provide them a waiver or <br />understanding that this will not be submitted until May or so. They were required to <br />� submit application within 12 months, which is not a huge issue. They are committed to <br />completing this. Is the Planning Commission comfortable with the Preliminary Plat <br />submitted as proposed and just do a Final Plat or should they complete a Preliminary Plat <br />with field locates with as-built conditions. The Preliminary Plat will verify that the lot <br />created conforms to the code. The proposed plan did that. If there were mistakes, the <br />Final Plat is only the outside dimensions of the lot with no locates. Mr. Marohn further <br />stated that if the Planning Commission were to forego the Preliminary Plat, we don't <br />know where it was really built and don't know the impervious coverage. However, there <br />is no reason to believe it is substantially different than proposed. <br />The Planning Commission directed Mr. Marohn to have WSN submit an as-built for <br />Preliminary Plat and acknowledges that this will not be completed until spring. <br />OLD BUSINESS: None. <br />APPROVAL OF MINUTES: <br />A motion was made by Deb Brown, seconded by Mark Hallan, to approve the December <br />16, 2010 Minutes as read. All members voted "aye". Motion carried. <br />�, ZONING ADMINISTRATOR'S REPORT: <br />Minutes 3 <br />Pequot Lakes Planning Commission <br />January 20, 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.