My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-13-2003 Long Range Planning Commission Minutes
Laserfiche
>
Planning & Zoning
>
Minutes
>
2003
>
02-13-2003 Long Range Planning Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2016 9:35:33 AM
Creation date
10/3/2016 9:35:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 3 <br /> Goal 3: To properly zone all of the property within the City limits. <br /> How to proceed: Once a future land use map has been adopted and land use classifications have been <br /> established,hold a series of public hearings at regular Commission meetings to establish a zoning <br /> classification for each property. Take three or four sections each month,perhaps more where there will <br /> be little controversy. This process will allow for each property owner to receive notification,will not <br /> overload the Commission, will allow us to deal individually with property owners and will provide a <br /> framework to deal with odd situations that may arise. <br /> Target dates: Begin in summer of 2003, complete by the end of 2004 (18 months total) <br /> Goal 4: Work with Loon Lake and Jenkins township to extend comprehensive planning and local <br /> zoning control to those areas. <br /> Thoughts and ideas: <br /> - The City may wish to consider an agreement with both townships to do their P&Z <br /> administration for them. The City could charge and collect fees(as we do with our own <br /> residents)to cover costs and the Townships could conduct their own hearings,when <br /> needed. Community Growth Consultants could assist them for hearings under a separate <br /> contract(not as the City of Pequot Lakes). <br /> - The Sibley Comprehensive Plan could be adapted to both of these areas,but without <br /> public hearings and town hall meetings,there probably won't be enough buy-in from the <br /> local public to make it viable long-term. <br /> - Townships can't receive funding from the Initiative Foundation,but the City could if we <br /> did a joint project with them. <br /> - Loon Lake Township is in Cass County (which is a good thing),but there may be some <br /> jurisdictional issues coordinating across counties. <br /> - This is a good idea,especially the Loon Lake side,but everyone should understand that <br /> this will not stop the City of Jenkins annexation/dumb growth machine. <br /> 02/13/2003 <br />
The URL can be used to link to this page
Your browser does not support the video tag.