Laserfiche WebLink
i y <br /> with a wood or masonry fence or wall, or densely planted hedge that <br /> blends with the natural environment. <br /> 4. Vehicles parked outside the screened storage area shall be limited to <br /> employees and temporary customer parking. There shall be no <br /> vehicles in a state of disrepair parked outside the screened storage <br /> area. No damaged vehicles shall remain outside in the screened <br /> storage area for longer than thirty days. <br /> 5. The site sign should be constructed of materials that blend in with the <br /> natural environment and that meet the size requirements as stipulated <br /> in Sections 80.060 and 80.120 of the Ordinance. <br /> 6. The steel frame building and screened storage area should not be <br /> used for any use other than that identified in the Conditional Use <br /> Permit. <br /> 7. The applicant shall coordinate with the City Utility Department for <br /> evaluation and inspection of proposed internal drainage system, <br /> particularly floor drains. <br /> All members voted "aye". Motion carried. <br /> APPLICANT: NWT LP <br /> Applicant requests Preliminary Plat of The Ridge (continuation). <br /> Mr. Marohn explained that he had not prepared a Staff Report due to the <br /> continuing process of modifying the Ordinance and a future land use map. The <br /> applicant had requested previously that this matter be tabled pending completion <br /> of the Ordinance and map. Mr. Marohn recommended tabling of this matter as <br /> the Ordinance and map process is not complete. <br /> Applicant was present: Joni Tulenchik, along with their attorney, Mr. Don Bye, <br /> 1775 County Road 17 S.W., Pequot Lakes, and also 609 West 2nd , Duluth, MN, <br /> with offices at 1000 Torrey Building, Duluth, MN 55802. <br /> He stated that the 60 acres on the east side of Highway 371 had been purchased <br /> for commercial development. He also stated that he had been informed that <br /> someone had contacted the City Attorney, Tom Fitzpatrick, who then contacted <br /> the Attorney General and the League of Minnesota Cities. <br /> Mr. Bye had compiled a handout for the Commission members outlining the <br /> timeline of the annexation. A copy of this handout is attached and made a part of <br /> these Minutes. Mr. Bye went on to discuss each item. <br /> Tom Woog questioned the confusion in #3. He made a public apology to Joni <br /> Tulenchik, as he has no recollection of the 2-page Resolution. He also has no <br /> recollection of a public hearing on the rezoning. He also indicated that he <br /> received a blank copy of this Resolution by fax from the City Clerk's Office 4 <br />