Laserfiche WebLink
The following is the succinct list of items to include in the <br /> Maintenance Department Facility Addition Feasibility Study. <br /> 1. A new Maintenance Facility using a pre-engineered timber <br /> column structure instead of a pre-engineered steel building <br /> system (both with in-floor heat). <br /> 2. A new Maintenance Facility using either of the two above <br /> building construction types would require an automatic <br /> sprinkler system. <br /> 3. The estimated cost of a fabric dome type salt shed and <br /> determine the useful life. <br /> 4. Clarify what the triggers are for taking care of present non- <br /> compliant items in the existing building. <br /> 5. Pull out addressing the non-compliant items because they <br /> should be addressed sooner or later. <br /> 6. Have other departments weigh in on present and future space <br /> needs in the present building? <br /> 7. Future development has been talked about in the northwest <br /> quadrant of the new Hwy 371 — CSAH 11 interchange, east of <br /> the present City Hall facility and parcel. What might it consist <br /> of? Will public works operations at the present site really be <br /> detrimental to such future development? Is there no way to <br /> screen public works activities from future development? <br /> 8. Be clearer on how the need for sanitary sewer and watermain <br /> for future development in the northwest quadrant of the new <br /> Hwy 371 — CSAH 11 interchange, east of the present City Hall <br /> facility and parcel, might impact the need for sanitary sewer <br /> and water service for an expanded Maintenance Facility. <br />