My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 - Facility Addition Feasibility Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2016
>
10-04-2016 Council Meeting
>
09.03 - Facility Addition Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2016 11:10:04 AM
Creation date
9/29/2016 11:10:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM #9.3 <br /> City of <br /> Pequot <br /> Lakes — -_ <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Nancy Malecha <br /> Date: October 4, 2016 <br /> Subject: Facility Addition Feasibility Study <br /> Report: At the September 6th City Council Meeting, the <br /> consensus of the Council agreed to charge the Building Committee <br /> with the task of determining the specifics for the Maintenance <br /> Department Facility Addition Feasibility Study and bring forth <br /> recommendations to the City Council. <br /> The Building Committee met on September 15th and recommends <br /> the City Council proceed with the Feasibility Study to include: <br /> • Only a new facility option consisting of 9,000 square feet <br /> with means for future expansion, <br /> • A fabric dome type salt shed, and <br /> • Include information addressing the succinct list of items <br /> noted below. <br /> The Committee analyzed both current and future space needs for <br /> the public works department and determined that a 9,000 square <br /> foot structure is adequate and should be constructed with the <br /> possibility of future expansion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.