My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.04 - Engineering Amendment to North Washington
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2014
>
03-04-2014 Council Meeting
>
09.04 - Engineering Amendment to North Washington
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 10:45:32 AM
Creation date
2/28/2014 10:38:56 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
February 26, 2014 <br />Amendment to Eng. Agreement <br />City of Pequot Lakes <br />Page 2 <br />North Washington Avenue <br />As mentioned in our original Engineering Agreement, It is important to note that as with <br />any construction, there may need to be modifications made to the quantities in the field. <br />As such, we recommend the City set aside a contingency fund in the amount of about <br />10% of the contractor's bid. <br />• Answer questions from bidders. <br />• Compute points and provide construction staking of retaining wall improvements. <br />• Administer construction (anticipated maximum two month long construction period) — <br />conforming executed Contract Documents, conducting the pre-construction meeting, and <br />reviewing shop drawings being three items of work under this task. <br />• Observe construction. We anticipate about a two month long construction period. During this <br />period, we are estimating 50 hours a week for 4 weeks and about 20 hours a week for the <br />other 4 weeks. <br />Please remember that observation time is very dependent on the selected Contractor's <br />means, methods, techniques, and sequences of construction; and can also be impacted <br />by weather and other forces under no one's control. <br />We propose to pertorm the above tasks on an hourly basis, in accordance with the attached fee <br />schedule, for an estimated amount of $40,500. <br />We will stay in touch with staff and the Council on our services so that everyone is aware of any <br />needed adjustments. <br />If you are in agreement with our proposed scope of services, please sign on the following page <br />and return one copy of this letter for our records. We appreciate the opportunity serve the City. <br />Widseth Smith Nolting <br />f� / ,A�i►` �� <br />�Y� <br />Timothy . Houle, P.E. <br />Civil Engineer � Vice President <br />Attachments: General Provisions of Professional Services Agreement <br />WSN Fee Schedule <br />c: Mike Rude, WSN <br />WSN File <br />J:10130B-City of Pequot Lakes\0130B0051-Pequot Lakes - N Washington Improvements\0130B0051.000-Pequot Lakes - N <br />Washington ImprovementslProject Management�20140226-Amendment to Engr Agr.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.