My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04C - Conditional Use Permit for an Extractive Use Anderson Brothers Construction
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2005
>
11-17-2005 Planning and Zoning Meeting
>
04C - Conditional Use Permit for an Extractive Use Anderson Brothers Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 2:26:24 PM
Creation date
7/29/2016 2:26:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pursuant to the 1 V�.'1uot Lakes Gjt- Ordinance, Section 170.050, the applicant should be prepared t <br /> 1 1 1 I.Gllll �h��,LLU vim. ar. <br /> the public hearing to discuss the following issues by explaining how the proposed Conditional Use <br /> will cause no sigaificant adverse effects. <br /> 2-J.,_ ,._!JL �.. .±SIJnr„L !L ._� use aS:. c,- y is-n, l._ .. Y ;r�_ r crr <br /> there is no impact,explain why. <br /> Limited impact hPrause of buffer area berms and location of processing equipment <br /> all will help reduce noise from operations all hauling will be onto 371 no other <br /> roads will be used coming out of site. <br /> (2) Describe character of the area and the existing patterns and uses of development in the <br /> area. How is this proposal consistent with those patterns and uses?d go thp pnggihilitIt of rundifinnal use for extraction and <br /> processing ravel materials is possible in this district <br /> (3) Describe the impact on the capacity of existing or planned community facilities(sewer,drainage, <br /> other). Describe if additional facilities will be required. <br /> ThPrP will- hp nn imparts nr additinn fa ilitioc r-PyO rind at this Citg All <br /> drainage from this site will be contained into pit itself. <br /> (4) Describe the impact on the character of the neighborhood in which the property is located. <br /> With large buffer area and traffic going onto 371 little impact to neighborhood. <br /> (5) Describe the impact to traffic on roads and highways in the vicinity, and expected traffic <br /> generated by,his application. Is there adequate parking av arable to accommodate the proposal.? <br /> ThP traffic frnm cite will all enter and Pxit nntn .171 No tnwnchip nr enunt)l <br /> roads will be impacted Estimajej truck traffic will be 25 continuous <br /> trucks hauling. Dust control will be water Calcium Chloride eventually paving <br /> of haul road. <br /> (6) Discuss any environmental limitations of the site or area. <br /> We have tested and meet all MPCA and EPA requirements before any operation <br /> start -iui11 have stormwater permit and all other applicable permits. <br /> REV: JAN 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.