Laserfiche WebLink
4. Water Supply <br /> reviewed the Phase 1 design in Dave's memo. <br /> The calculations appear to be appropriate for Phase 1. <br /> As Dave stated in his memo, they will be submitting to the Minnesota Department of Health <br /> too (opportunity for another check) . <br /> If anyone has any questions, do not hesitate to call. <br /> Times <br /> Timothy M. Houle, P.E. <br /> Civil Engineer, Vice President <br /> Widseth Smith Nolting <br /> 7804 Industrial Park Road <br /> P.O. Box 2720 <br /> Baxter, MN 56425-2720 <br /> Direct: 218.316.3646 <br /> Cell: 218.820.6590 <br /> Office: 218.829.5117 <br /> Fax: 218.829.2517 <br /> Email: thoule @wsn-mn.com <br /> 2 <br />