My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04A - Preliminary Plat of Evergreen Fourth Addition
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2005
>
09-15-2005 Planning and Zoning Meeting
>
04A - Preliminary Plat of Evergreen Fourth Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 11:33:04 AM
Creation date
7/29/2016 11:33:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
television natural gas,etc.) lo' <br /> Staff Findings: We have reviewed the application and propose the following findings of fact <br /> for you to consider: <br /> 1. In reference to the five concerns from the previous preliminary plat proposal: <br /> a. Lots 5, 6, 7, 8, and 9 have been removed from the revised preliminary plat approval <br /> and integrated with Outlot B. <br /> b. The road originally proposed on the west wide of the lot has been removed from the <br /> revised preliminary plat and integrated with Outlot B. <br /> c. Lots 1, 2, and 6 have been removed from the preliminary plat and integrated with <br /> Outlot B. <br /> d. Lot 6 has been removed from the preliminary plat and integrated with Outlot B. <br /> e. The radius of the proposed cul-de-sac has been modified to be 68 feet, which meets <br /> the requirement of the City Ordinance. <br /> f. The proposed road has not been extended to the southerly property line. <br /> 2. The land is zoned Residential,and is suitable for the four proposed residential lot. <br /> 3. The property contains steep slopes and wetlands throughout the property that will <br /> hinder future development in the proposed Outlo. f5 <br /> 4. Lots 1 and 2 of Block One and Lot 1 of Block Two, would be able to be developed for <br /> residential use without major topographic alteration. <br /> 5. Lot 2 of Block 2 may require some topographical alterations for development due to the <br /> slope. However, the slope would not inhibit all development. Lot 2 has been expanded <br /> from the original proposed to include more developable area. <br /> 6. There is adequate space within the building envelope on each proposed property for a <br /> primary and alternate individual sewage treatment system(ISIS). The soils are reported <br /> to be"Very Suitable"for septic tank and drainfield applications,but soil borings were not <br /> provided and would need to be done prior to septic installation. <br /> 7. The proposed four lots meet the minimum lot size of 30,000 square feet: <br /> a. Block 1, Lot 1:58,802 square feet <br /> b. Block 1,Lot 2:53,902 <br /> c. Block 2, Lot 1: 57,834 <br /> d. Block 2,Lot 2: 83,838 <br /> 8. The four proposed lots exceed the minimum 125 feet of width requirement in the <br /> Residential lot. <br /> 9. The four proposed lots are capable of not encroaching on required setbacks. A variance <br /> would not be needed for construction. <br /> lo. The proposed lot layout is not incompatible with the layout of adjoining properties and <br /> will not inhibit future development. <br /> 11. All lots have at least 33 feet of frontage on a public right-of-way with the,proposed road. <br /> 12. The proposed public road is on relatively flat ground and shoul06o e any significant <br /> difficulties for construction. <br /> 13. Public access it not being provided to adjacent properties; however, the steep slopes <br /> would inhibit connections to the west and south. Highway 371 lies to the west. The Paul <br /> Bunyan trail lies to the east and access is being provided through Outlot A. Although the <br /> property to the south already has access to a public road, there is the potential for a <br /> future connection through Outlot B with future development. <br /> 14. The applicant has indicated that utility easements will be provided for as required in the <br /> Ordinance. <br /> 15. The applicant outlined the Erosion Control Plan which includes: <br /> a. All ground disturbed by construction is to be stabilized as soon as possible using <br /> `.. seed and mulch turf establishment <br /> b. Maintain Vegetation along property lines and areas undisturbed by construction. <br /> c. No filling or disturbing wetland(s)areas. <br /> City of Pequot Lakes Staff Report 2_3 <br /> September 15,2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.