My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11.01 - Accept Quote from EL Builders for Cole Memorial Building Roof
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2008
>
08-05-2008 Council Meeting
>
11.01 - Accept Quote from EL Builders for Cole Memorial Building Roof
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2014 3:38:42 PM
Creation date
10/20/2014 8:44:35 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
cis AGENDA ITEM #11 .1 <br /> `"" Pet ?t <br /> LaV e s. <br /> REPORT TO <br /> CITY COUNCIL <br /> Date: August 5, 2008 <br /> Subject: Accept Quote from EL Builders for Cole <br /> Memorial Building Roof <br /> Report: In keeping with the plan to continue the <br /> improvements and restoration of the Cole Building, I have <br /> received two quotes for work on the front exterior entry <br /> area. To bring the building closer to the original design <br /> requires removal of the projector room on the roof, <br /> replacement of the siding and trim on that side of the <br /> building. <br /> The City received two quotes; United Building Center - <br /> $8,059.94 and E.L. Builders - $7,418.50. <br /> Council Action Requested: To accept the low quote from <br /> E.L. Builders at $7,418.50, that the project be funded by <br /> the 2008 General Building Capitol Outlay account, and <br /> authorize staff to proceed with the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.