My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.05 Temporary Skate Park
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
11-07-2017 City Council Meeting
>
09.05 Temporary Skate Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2017 12:36:27 PM
Creation date
11/2/2017 12:36:24 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM #9.5 � <br /> � <br /> city of <br /> Pe uot <br /> q � <br /> Lakes — - <br /> REPORT TO , <br /> CITY C OUNC <br /> IL �'� <br /> Report Prepared by: Nancy Malecha <br /> Date: November 7, 2017 <br /> Sub_iect: Temporary Skate Park <br /> Report: The Park Commission is recommending the <br /> placement of a temporary skate park to be located below <br /> the bobber water tower on the Tower Square road segment. <br /> The attached map highlights this 25' x 80' area in red. Eric <br /> Dahlberg has graciously offered to donate the equipment <br /> and Community Action of Pequot Lakes has graciously <br /> offered to donate $1,700 to overlay this segment of road. <br /> The overlay and placement of the equipment would occur <br /> in the spring of 2018 and would be revisited annually. <br /> The following are some items for Council consideration. <br /> • The City's insurance agent has no liability concerns <br /> regarding the temporary skate park equipment. <br /> • Luke Sydow from SAS+ Associates noted that the <br /> temporary skate park location will hinder construction <br /> of the Trailside Park Improvement Proj ect due to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.