Laserfiche WebLink
AGENDA ITEM #9.2 <br /> City of <br /> Pequot <br /> Lakes= <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: July 6, 2017 <br /> Subject: Maintenance Facility Design <br /> Report: The Council approved us proceeding into the <br /> design phase for the maintenance facility project. Our <br /> design team has taken the previous study and schematic <br /> information, the comments from the Council, have met <br /> with Mike Loven, and are proceeding with putting together <br /> construction drawings and specifications. We do not have <br /> a time frame, yet, for publicly bidding these improvements; <br /> however, the rough time frame is to bid over the winter so <br /> the construction contractor can begin in the spring of 2018. <br /> Council Action Requested: No Council action requested. <br />