My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 Maintenance Facility Design
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
07-06-2017 City Council Meeting
>
09.02 Maintenance Facility Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2017 3:30:17 PM
Creation date
6/29/2017 3:30:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM #9.2 <br /> City of <br /> Pequot <br /> Lakes= <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: July 6, 2017 <br /> Subject: Maintenance Facility Design <br /> Report: The Council approved us proceeding into the <br /> design phase for the maintenance facility project. Our <br /> design team has taken the previous study and schematic <br /> information, the comments from the Council, have met <br /> with Mike Loven, and are proceeding with putting together <br /> construction drawings and specifications. We do not have <br /> a time frame, yet, for publicly bidding these improvements; <br /> however, the rough time frame is to bid over the winter so <br /> the construction contractor can begin in the spring of 2018. <br /> Council Action Requested: No Council action requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.