My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 Maintenance Facility Schematic Design Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
05-02-2017 City Council Meeting
>
09.03 Maintenance Facility Schematic Design Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 1:35:08 PM
Creation date
4/27/2017 1:35:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of <br /> AGENDA ITEM #9.3 <br /> Pequot <br /> Lakes—_—____- _-_ <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: May 2, 2017 <br /> Subject: Maintenance Facility Schematic Design Update <br /> Report: The Core Team met on April 20th for the <br /> Schematic Design kick-off meeting. Widseth Smith <br /> Nolting (WSN) is now taking the information from this <br /> meeting and preparing initial building floor plans. We <br /> anticipate having a review meeting with the Core Team by <br /> the latter part of May. Based on the feedback from this <br /> review meeting, we will then refine the floor plan and <br /> prepare a probable construction cost. <br /> Council Action Requested: No Council action requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.