My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03B Maintenance Facility - Proposal for Schematic Design Services
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2017
>
03-07-2017 City Council Meeting
>
09.03B Maintenance Facility - Proposal for Schematic Design Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2017 9:14:15 AM
Creation date
3/2/2017 9:14:14 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of <br /> AGENDA ITEM #9.3.B <br /> Pequot (i)Lakes--_:_-_—_ <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: March 7, 2017 <br /> Subject: Maintenance Facility — Proposal for Schematic <br /> Design Services <br /> Report: As a follow-up to Council discussions these last <br /> few months on the Maintenance Facility's Feasibility <br /> Study, Widseth Smith Notting (WSN) has provided the <br /> City with the attached proposal for the next step. That next <br /> step is to go through a schematic design for a new <br /> Maintenance Department facility located on a new site, <br /> including a fabric dome salt storage shed. At the <br /> conclusion of this schematic design phase, the City will <br /> have a preliminary site plan, floor plan, exterior building <br /> elevations, and estimated construction costs (more refined <br /> and based on more detail than the one in the Feasibility <br /> Study). The results of the schematic design can then be <br /> used to prepare detailed final design and construction <br /> documents for public bidding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.