Laserfiche WebLink
City of <br /> AGENDA ITEM #9.3.B <br /> Pequot (i)Lakes--_:_-_—_ <br /> REPORT TO <br /> CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: March 7, 2017 <br /> Subject: Maintenance Facility — Proposal for Schematic <br /> Design Services <br /> Report: As a follow-up to Council discussions these last <br /> few months on the Maintenance Facility's Feasibility <br /> Study, Widseth Smith Notting (WSN) has provided the <br /> City with the attached proposal for the next step. That next <br /> step is to go through a schematic design for a new <br /> Maintenance Department facility located on a new site, <br /> including a fabric dome salt storage shed. At the <br /> conclusion of this schematic design phase, the City will <br /> have a preliminary site plan, floor plan, exterior building <br /> elevations, and estimated construction costs (more refined <br /> and based on more detail than the one in the Feasibility <br /> Study). The results of the schematic design can then be <br /> used to prepare detailed final design and construction <br /> documents for public bidding. <br />