My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.03 - Facility Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2013
>
07-02-2013 Council Meeting
>
09.03 - Facility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2014 2:41:01 PM
Creation date
12/16/2013 3:08:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ci ty of <br />Pequot <br />Lakes - <br />AGENDA ITEM #9.3 <br />REPORT TO <br />CITY COUNCIL <br />Report Prepared by: Mike Loven, Public Works Supervisor <br />Date: July 2, 2013 <br />Subiect: Facility Study <br />Report: The time has come for the City to consider its <br />options for the way it discharges its treated wastewater. <br />With the Highway 371 by-pass plan going directly through <br />the middle of the current spray irrigation field and the <br />amount of time involved in the engineering and permitting <br />process from various agencies, the City should request a <br />proposal from WSN for a facility study. The study would <br />look at all options open to the City. <br />Council Action Requested: Council motion to request a <br />proposal for a facility study by WSN. <br />
The URL can be used to link to this page
Your browser does not support the video tag.