My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-02-2015 Park Commission Minutes
Laserfiche
>
Parks
>
Minutes
>
2015
>
04-02-2015 Park Commission Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2015 8:38:10 AM
Creation date
4/20/2015 8:38:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEQUOT LAKES PARK COMMISSION <br /> THURSDAY, APRIL 2, 2015 <br /> CITY HALL <br /> Members Present: Chair Malecha, Commissioners Bruch, Caouette, and Ronning <br /> Members Absent: Commissioner Nagel, Ettesvold and Nordby <br /> Also Present: Greg Karr, Council Member Liaison; Mike Loven, Public Works <br /> Supervisor; and Sandy Peine, City Clerk. <br /> 1. Call Meeting to Order <br /> Chair Malecha called the meeting to order at 8:00 a.m. <br /> 2. Consider Agenda <br /> COMMISSIONER BRUCH MOVED TO APPROVE THE AGENDA. <br /> COMMISSIONER CAOUETTE SECONDED THE MOTION. THE MOTION <br /> CARRIED 4-0. <br /> 3. WSN Proposal for Design of Trailside Park Restrooms <br /> Commissioner Ronning reviewed the specifics of the restrooms that he and Chair <br /> Malecha viewed in Baxter. He noted that after viewing a larger restroom facility <br /> he and Chair Malecha would be recommending two toilet fixtures in the women's <br /> side and one toilet fixture and one urinal fixture in the men's side as they felt one <br /> stall per side would not be sufficient. The Park Commission discussed the <br /> restroom size and concurred that a one stall per side would not work especially <br /> when considering the future use of the facility. The Commission talked about the <br /> design of the facility and were in agreement that the style that was presented <br /> would work as it is easy to clean, made of good materials, and graffiti resistant. <br /> The Clerk provided an excel spreadsheet that provided possible funding options <br /> for the restroom. The Commission understood that the cost for the two per side <br /> facility is more than what was budgeted but felt it would be a mistake to build the <br /> two stall facility. <br /> COMMISSIONER RONNING MOVED TO APPROVE THE DESIGN OF THE <br /> BUILDING WITH TWO STALLS FOR WOMEN AND TWO STALLS FOR MEN <br /> AND TO APPROVE THE FUNDING SOURCES PROVIDED BY CITY STAFF. <br /> COMMISSIONER BRUCH SECONDED THE MOTION. MOTION CARRIED 4-0. <br /> COMMISSIONER BRUCH TO APPROVE THE PROPOSAL FOR DESIGN <br /> SERVICES FROM WSN FOR THE TRAILSIDE PARK SEASONAL <br /> RESTROOM FACILITY. COMMISSIONER CAOUETTE SECONDED THE <br /> MOTION. MOTION CARRIED 4-0. <br />
The URL can be used to link to this page
Your browser does not support the video tag.