My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7(b) Land Use Permit Extension
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2018
>
05-17-2018 Planning Commission Meeting
>
7(b) Land Use Permit Extension
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2018 10:30:28 AM
Creation date
5/11/2018 10:30:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��s� <br /> �'��uot <br /> L��s:� <br /> NEW BUSINFSS—PERMTT EXTENSION <br /> Application: Land Use Permit Extension <br /> Applicant: Louisa 7`iegen <br /> Agenda Item: �(b) <br /> Background Information: Louise Tiegen was issued Land Use Permit #i5-32 <br /> May 22, 2oi5 for the construction of a new dwelling and attached garage. On <br /> November 2, 201� Land Use Permit #i�-8i was issued extending the original <br /> permit six months to May 2, 20�8. <br /> The e�rterior of the dwelling and the garage is not complete. Ms. Tiegen has <br /> requested a permit e�rtension to complete same. Ms. Tiegen will attend the <br /> Planning Commission meeting to answer questions. <br /> Applicable Regulations: <br /> Section 17-11.8 LAND USE PERMITS <br /> 7. Unless extended by the Zoning Administrator, where a Land Use Permit <br /> has been issued but no action has occurred within 12 months, the Land Use <br /> Permit shall be null and void. Exterior work on the structure shall be complete in <br /> 24 months from the issuance of the Land Use Permit. The time limit may be <br /> extended up to six months by the Zoning Administrator for good cause. A second <br /> extension shall be decided by the Planning Commission. <br /> Staff Recommendation: We recommend that Land Use Permit #i�-8i be <br /> extended to November i�, 20�8 (six months) or to a date determined by the <br /> Planning Commission. <br /> Pequot Lakes Staff Report 7�)-1 <br /> May i�,2oi8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.