Laserfiche WebLink
1. The impact on the wetlands from the stormwater runoff and the stormwater <br /> management issues that would occur due to the steep slopes and lay of the land. Lots <br /> 5, 6, 7, 8, and 9 all would drain into the wetland on the center of the subdivision, and <br /> the wetland is contained in part on each of those lots. <br /> 2. The variations in elevation and steep slopes of the proposed public road on the west <br /> side of the plat. <br /> 3. The steep slopes on Lots 1, 2, and 6 limit the ability to build. <br /> 4. The lack of identified drainfield locations for sewage treatment on Lot 6. <br /> 5. The radii on the cuts-de-sac are smaller than what is required by the Ordinance. <br /> Based on the findings of fact in this report,the Staff recommends that the application be tabled to <br /> allow the applicant the opportunity to address these issues and for the City Engineer to comment. <br /> L <br /> June Staff Report 44 <br />