Laserfiche WebLink
I. No deed restrictions, covenants, or easements have been submitted to preserve <br /> and maintain open space or utility access. <br /> 2. Although this is a commercial PUD, a resort/homeowners association is required. <br /> The applicant has attested to how this will be done, but no information on this has <br /> been submitted. <br /> 3. More than 50 percent of the proposed PUD is open space, which does not include <br /> dwellings, roads,parking spaces, or any other developed areas. <br /> 4. More than 50 percent of the shore impact zone is preserved. Deed or other type <br /> of restrictions will be required to prove continued protection. <br /> 5. An erosion control plan has not been submitted. <br /> 6. A stormwater management plan has not been submitted. The applicant is required <br /> to be prepared for a 100-year,24 hour storm event with no ponding or flooding of <br /> structures. The survey does indicate that two stormwater retention ponds will be <br /> included in the development, but volumes and conveyance mechanisms have not <br /> been calculated. <br /> 7. Commercial PUDs allow up to 35 percent impervious surface with a stormwater <br /> management plan and up to 25 percent impervious coverage without a stormwater <br /> management plan. The development does not exceed 22 percent impervious <br /> coverage in any tier or overall. <br /> 8. The PUD will use a centralized ISTS system for all of the resort units. The <br /> drainfield at the tip of the peninsula is to be removed, and the drainfield at the <br /> northeastern edge of the property will remain. An additional drainfield will be <br /> added on the northeastern side of the development. <br /> 9. The units are clustered on the southeastern portion of the property. The northern <br /> portion of the property is primarily wetland. No development is proposed in the <br /> wetland. <br /> 10. A beach and picnic area is located on the southern part of the eastern edge of the <br /> property. These areas have been consolidated into one area to reduce their overall <br /> impact. <br /> 11. The PUD is allowed up to 34 mooring sites; one site for each unit in the first tier. <br /> The PUD is also allowed one day dock for loading and unloading for units beyond <br /> the first tier. The PUD exceeds the allowed number of mooring sites with a <br /> proposed 48 mooring sites. <br /> 12. The mooring sites are proposed in two sections on both sides of the peninsula. <br /> 13. The survey does not indicate what existing vegetation would be removed or what <br /> kind of screening would be kept or planted. <br /> 14. The proposed accessory structures meet the setback requirements. <br /> Other <br /> 1. Middle Cullen Lake has 29, 416 feet of shoreline, as per GIS data provided by <br /> Crow Wing County. Wilderness Resort has a total of 2,653 feet of shoreline. The <br /> resort comprises 9.0% of the total shoreline on the lake. <br /> 2. Each unit is required to have 1.5 parking spaces. This information is not indicated <br /> on the survey. <br /> 3. The survey does not indicate where any signage will be placed. <br /> February Staff Report Page 15 <br />