My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.05 - Facility Addition Feasibility Study
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2016
>
08-02-2016 Council Meeting
>
09.05 - Facility Addition Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2016 2:56:28 PM
Creation date
7/27/2016 2:56:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WIDSETH <br /> KI-v- SMITH <br /> NOLTING <br /> CITY OF PEQUOT LAKES Brain erd:Baxter <br /> MAINTENANCE DEPARTMENT FACILITY ADDITION 7804 Industrial Park Road <br /> PO Box 2720 <br /> Baxter,MN 56425-2720 <br /> FEASIBILITY STUDY 218.829.5117 0 <br /> 21&829.2517 <br /> Brainerd @wsn.us.com <br /> Pequot Lakes, Minnesota 4UidsethSmithNolt1nrcom <br /> Building Observation Date: January 13,2016 <br /> Building Representative: Lance Ray,Maintenance Worker <br /> WSN Personnel: Erica Marcussen,A.I.A. <br /> Ashley Martel,Architectural Designer <br /> Eric Jendro,P.E. <br /> John Pilegaard,P.E. <br /> Tim Houle,P.E. <br /> WSN Project No.: 013080057 <br /> Building Designed: 1998 (Spring) <br /> Building Footprint: 22,000 Square Feet <br /> Executive Summary <br /> Widseth Smith Nolting was hired by the City of Pequot Lakes to complete a study for an addition to the north <br /> portion of the existing City Hall building for the City's Maintenance Department.The north portion of the <br /> existing City Hall building includes spaces—offices,meeting rooms, and vehicle storage-for the Police,Fire, <br /> and Maintenance Departments.The study includes evaluating code compliance,building life-safety,and structural <br /> adequacy.The study also includes a new salt shed at the City Hall site.As an alternative to the option of additions <br /> to the existing site,the study reviews an alternate site for the Maintenance Department. <br /> Mechanical and electrical engineers and an architect from WSN spent time going through the existing building on <br /> January 13,2016 with the maintenance personnel to gain the knowledge and familiarity necessary to prepare this <br /> evaluation.The following pages of this study summarizes the major issues relating to areas of architecture,civil, <br /> structural,mechanical systems,and electrical systems in and around the existing building. <br /> The existing building is constructed of a pre-manufactured steel structure with a metal panel roof and exterior and <br /> interior wall finish and slab-on-grade concrete floor. In general,the building is in relatively good condition and <br /> has the structural capacity for an addition to the north. However,fire protection and the heating,cooling, <br /> ventilation and exhaust systems were all found to be non-compliant in the parking garage area of the building, <br /> and will need to be corrected as part of the addition. <br /> The estimated probable construction costs for Option 1 (Building Addition and Upgrades)are$823,000.The <br /> estimated probable construction costs for Option 2(New Buildings on Alternate Site)ranges from$1,368,000 to <br /> 1,476,000. A breakdown of the costs can be found in the last section of this study. <br /> EnTneerinz Architecture Surveying Environmental <br />
The URL can be used to link to this page
Your browser does not support the video tag.