Laserfiche WebLink
MONTHLY WATER/WASTEWATER REPORT <br /> FOR NOVEMBER 2004 <br /> Water Plant: All working fine. No problems. <br /> Fire Hydrants: All good. No bad hydrants. All drained down for winter months. <br /> Watermain: All good. No problems. <br /> Water Tower: Repaired bad isolation valve for tower recirculation pump. Pump <br /> needs new seal and bearing. Cost of repair is approximately <br /> $550.00. Pump is in for repairs. <br /> Ponds/Blowers: All good. No problems. Repaired damaged fence due to deer <br /> crossing. <br /> Lift Stations: Main lift station#3 had a motor starter short out. Replaced with <br /> used one for now. Checking into replacing with larger starter. <br /> Sanitary Sewer: All good. No backups. <br /> Sincerely, <br /> BRETT TWARDY <br /> Water/Wastewater Operator <br />