My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Item 09.4 - Sibley Lake Park - Dog Park
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2013
>
12-03-2013 Council Meeting
>
Agenda Item 09.4 - Sibley Lake Park - Dog Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 9:42:11 AM
Creation date
1/28/2014 10:15:18 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dog Park: <br />At the request of the Council, the Park Board again reviewed possible locations of <br />a Dog Park in Pequot Lakes. Locations considered were: behind the Water Plant, <br />under the new water tower, Mayo Lake Park, North Trailside Park, Sibley Lake <br />Pa rk. <br />After further discussion, it was the unanimous conclusion that Sibley Lake Park <br />continues to be the best location for this amenity as it would increase appropriate <br />usage of this park, the major goal of the Park Board. <br />The Board recommends switching the location of the Dog Park within Sibley Lake <br />Park. By flipping the designated area from the south portion of the park to the <br />north portion, freer access to the fishing pier steps, a concern of some, would be <br />provided. This also provides a slightly larger area for the Dog Park. The Board <br />strongly feels that, should this park gain maximum use, another pog Park could be <br />established in the future. In the meantime, it is felt that this space is more than <br />sufficient. <br />There are two pieces of playground equipment that will need to be relocated. <br />The Board's suggestion is that the wooden piece of equipment be relocated to <br />Gildner Park (Pillsbury and Oak) as it fits with the look and, further, neighborhood <br />residents have been requesting additional equipment. The large metal swings <br />would be relocated to the south area of Sibley Lake Park, painted a bright color, <br />and gain new seats. The proposed new playground equipment would also be <br />located in this area. <br />The current outhouse in the area could either remain or could be removed. If it is <br />removed, the Board feels that, when the park is fully utilized, the City could <br />consider building a"real" bathroom on the site. <br />Finally, the Board feels that it is extremely important for the electrical posts to be <br />removed as soon as possible, with wires buried in the park. Rather than <br />decorative lamp posts, it is the recommendation that the light posts be reused. <br />
The URL can be used to link to this page
Your browser does not support the video tag.