Laserfiche WebLink
October 25, 2013 <br />WIDSETH <br />, SMITH <br />NOLTING <br />Baxter/Braicierd <br />7804 Intlustrial Park Road <br />PO Box 2720 <br />Baxtet, MN 5642rr2720 <br />218.829.5117 0 <br />218.829.2517 � <br />8rainerdewsn.us.com � <br />Honorable Mayor and Council Members <br />City of Pequot Lakes "nds��"°�"��'�°m <br />4638 County Road 11 <br />Pequot Lakes, MN 56472-0361 <br />Re: Professional Land Survey Services for Sibley Lake Pa�k, Pequot Lakes, MN <br />Honorable Mayor and Council Members: <br />Widseth Smith Nolting (WSN) is pleased to submit this proposal for professional land surveying <br />services for the City P��Ic referenced above. It is our understanding that you are inte�ested in <br />completing a base map of the pa�lc that can be used for future planning and development of <br />additional park amenities. We feel there are a number of important items to consider when <br />producing a map of this nature. They include accuracy, completeness and the ability to revfse <br />the map in the future as new features are added to the park. The map we will present to you will <br />meet all these conditions and should serve you well for many years. <br />The scope of services we propose to provide and the associated estimated cost are as follows: <br />Survev Services <br />• Use previous WSN survey information as the basis of our work. <br />• Locate the existing improvements on the park parceis including, but not limited to, the <br />playground area, swings, picnic shelter, bbq grill, steps, roadways and walking paths and <br />visible evidence of utilities. <br />• Prepa�e an Existing Conditions Survey drawing showing our findings along with the <br />approximate park boundaries and avaiiable aerial photography. <br />• Provide 4 paper copies and an electronic pdf version of the drawing for your use. <br />Estimated Cost $1,900.00 <br />If you are in agreement with our proposal, please sign, date and return a copy of this proposal as <br />our authorization to proceed. We are prepared to schedule the field services within 14-21 days <br />of receiving authorization with the office work to follow. <br />Engineering i Architecture I Surveying I Environmental <br />