Laserfiche WebLink
I'EQUOT LAKES AREA FIRE BOARD <br />MEETING MINUTES OCTOBER 30, 2013 <br />Chairman Peterson called the PLAFB meeting to order. Merr�bers in attendance Members <br />in attendance were Hart, Benson, Mayor Adams, Dubay, Sodd, Mayor Weaver, Rudber�, <br />Nelson, Peterson, Donovan, and Bartels. <br />The mi�utes of the last meeting were not read due to a motion by �1Veaver, second by <br />Bensor�, motion passed. <br />The third quarter fire calls totaled 14. B� types, there were 8 good intent, 3 mutual aid <br />structure, 1 grass fire, 1 gas line cui, and 1 hay baler and grass fire. By location, there <br />were 8 to Pequot Lakes, 2 to �reezy Point, 1 to Loon Lake Township, 1 to 1l�Iission <br />Township, 1 to Pine River, and 1 to Nisswa. There were 3 bills sent that totaled <br />$1070.00. Grass fires are generally caused when people burn and do not extinguish their <br />fire completely and the next day wind picks up and the fire re-ignites. Kids playing with <br />lighters ca.n also be a eause for these fires. <br />Training for the third quarter includes 3 hours of air care landing zone establishing, 3 <br />hours hose testing, hose rolling, hose nozzle operation, and high volume hose o�eration, <br />and 4 hours physical fitness and agili�y testing. <br />The third quarter financial report was discussed. Sunkers were over budget due to some <br />turnout gear for 2012 actually billed in 2013 and having to replace all our outdated fire <br />helmets. Qur department is on a three per year gear replacemeni which takes 10 g�ears. <br />We have approximately $110,000 available to use for our new en�ine if we use $86,000 <br />from our cash balance, $12,000 from debt service principal, and $12,000 from debt <br />service interest. Our Peterbuilt engine was paid oif early so these debt service funds are <br />available. Sodd motioned to approve the financial report second by Donovan, motion <br />�assed. <br />Chief Nelson informed the Board that the truck committee selected Custom Fire from <br />Osceola, Wisconsin, ta manufacture our new engine. It will be very similar to our <br />Peterbuilt engine we currently have. The truek will cost about $415,000 and our loan is <br />for $350,000. The chassis is a Freightliner. tiVe are paying an extra $2000.00 for fees to <br />use a U. S. consortiurn to bid for lower costs for our engine. However, we should save at <br />least $10,000 from lower costs. Once the truck is ordered, the time to manufacture it <br />should be about 300 days. It may be possible to have it by the 4�' of July. The truck <br />committee has over a yeax of research during this process. Custom Fire's trucks are a1I <br />bolted together so they are easier to repair. <br />The department received a$300.00 donation from the Breezy Point Women"s Club to <br />purchase step chocks that are used for rescue. Tom Nelson, Daren Nordby, and Trevor <br />Lang were winners in the Department's weight loss contest that ended July 4th. Two <br />