Laserfiche WebLink
To: City Council <br /> From: Brett Twardy <br /> Monthly Water/Wastewater Report <br /> July 2004 <br /> Water Plant: All working fine. Filters backwashed on a weekly basis, has dropped <br /> manganese levels significantly. General housekeeping in order. <br /> Fire Hydrants and Water Mains: All working fine. Tower good. Contacted electrician <br /> about freezing protection. Will install conduit in August. Repaired broken hydrant valve <br /> standpipe at Hydrant #20 on Morehouse Drive. (Don Messick's) <br /> Ponds/Blowers: Spray Irrigation on schedule. Irrigators having several problems such as: <br /> flat tires, blown valves, emergency relays, and electrical motors having to be replaced. <br /> Lift Stations: L.S. #4 Industrial Park had stuck check valve, but is now in working order. <br /> L.S. #3 Main Lift has had the new impellers, heaters, and electrical sensors repaired. All <br /> Lifts working excellent. Added L.S. Degreaser/Deoderizer in L.S.#2 and#4 due to grease <br /> and odor caused by high humidity. <br /> Sanitary Sewer: Infratech jetted and cut roots on entire sewer main from the school to <br /> the UBC Lift Station#2. They also jetted Rae Ave. Will bill Precision Waterjet for <br /> additional costs. Several sewer back-ups. (Bev Williams and Richard Markham) One was <br /> city's responsibility,the other was not. See enclosed Back-up sheet. <br /> General Comments: Cell phones not working properly. Not all messages being <br /> received. Reception not that great. New city truck working great. Winch has been used <br /> many times: repairing tires, lifting heavy objects. Still no word on Tina's possible <br /> deployement. Due to the fact that Nancy Caputa is leaving, Tina,Nancy R., Sandy, and <br /> myself will be training on Water/Sewer Billing. <br /> Sincerely, <br /> Brett Twardy <br /> Water/Wastewater Superintendent <br />