Laserfiche WebLink
City of Pequot lakes <br /> Monthly water wastewater report <br /> Date: October 25, 2005 <br /> Month: September, October 2005 <br /> Waterplant: All working well, no problems. <br /> Ponds/blowers: The air diffuser that was broken has been <br /> replaced. Also the main air lateral on the north primary pond <br /> has also been repaired, their was no major excavation that <br /> needed to be done so the cost to repair this line was minimal , <br /> approximately $ 50.00, all is working good. <br /> Fire hydrants: Started flushing the mains, so far we have <br /> completed the East half of town. <br /> Lift stations: All lift stations have been cleaned and checked, all <br /> good. <br />