My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07 - Water/Wastewater Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
10-04-2005 Council Meeting
>
07 - Water/Wastewater Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 8:33:39 AM
Creation date
7/18/2016 8:33:38 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Pequot lakes <br /> Monthly water wastewater report <br /> Date: Sept 29, 2005 <br /> Month: September, 2005 <br /> Waterplant: All working good. The level transmitter is in and <br /> working fine. <br /> Ponds/blowers: The ponds are down to storage capacity and spray <br /> irrigation is completed. Will start to winterize the system within a <br /> week. Will repair air diffuser next week. <br /> Fire hydrants: Plans to replace the hydrant by Pfeifer drug will <br /> take place in October. Hydrants that needed painting are <br /> completed. <br /> Lift stations: All working good, will start to calibrate in October, <br /> also clean all lift stations. <br /> Sanitsr�r sewer: The jetting of the city is completed. Will continue <br /> to jet problem areas next week. <br /> General comments: I have included an area rate study sheet in <br /> your packet to look at so week can take pro active steps in <br /> increasing the WAC and SAC fees for the year of 2006. We are in <br /> dire need to start building our reserves for future expansion of our <br /> wastewater treatment facility as well as planning for future <br /> improvements of the water plant, infrastructure for water and <br />
The URL can be used to link to this page
Your browser does not support the video tag.