My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
13 - Engineer's Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
09-06-2005 Council Meeting
>
13 - Engineer's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 3:21:08 PM
Creation date
7/15/2016 3:21:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pequot Lakes - Hwy 371 North <br /> August 21, 2005 <br /> Page 6of14 <br /> Pillsbury(see the WSN May 2000 Feasibility Report on Roadway and Utility <br /> Improvements for the Brunes-Royce Addition for a proposed layout and estimated costs). <br /> Considering the present unknown nature and timing of development in this area, the City is <br /> not yet sure whether to initiate such a project as part of the highway project or wait to see if <br /> development would drive such a project at some future time. <br /> 27. On the east side of the highway, the City requested MnDOT to include upgrading Old 371 <br /> to MnDOT's service standards as a part of this project's costs. <br /> MnDOT will not participate in upgrading an existing road, even if it is part of the proposed <br /> service road network(besides, no accesses on the highway are being closed thru this <br /> stretch). <br /> The City can upgrade this road as a part of the highway project (the City would get more <br /> "bang for their buck" due to economy of scale in conjunction with this larger project). <br /> 28. On the east side, along Old 371, the City has in the past looked at extending City watermain <br /> and sanitary sewer south from Engen Road (see the WSN May 2000 Feasibility Report on <br /> Roadway and Utility Improvements for the Brunes-Royce Addition for portions of such <br /> proposed layouts as well as estimated costs). <br /> Considering the present unknown nature and timing of development in this area, the City is <br /> not yet sure whether to initiate such a project as part of the highway project or wait to see if <br /> development would drive such a project at some future time. <br /> 29. There is a City watermain in a casing pipe under TH 371 on the south side of Pillsbury <br /> Street (installed in 1999), and the casing pipe will need to be extended at the City's cost as <br /> part of this project. <br /> This watermain (uncased) then turns north and parallels about 15 feet within the easterly <br /> TH 371 R/W for about 260 feet north before turning east along the south R/W of <br /> Morehouse Drive. <br /> The line is in MnDOT's R/W by permit and if the highway construction impacts the <br /> watermain in some way, the City will have to either encase it or relocate it at their expense. <br /> We are awaiting feedback from MnDOT on what they will require from the City on a <br /> watermain such as this. <br /> 30. At the full access Morehouse Drive intersection, MnDOT has projected traffic volumes and <br /> the results do not come close to warranting a traffic signal at this intersection. <br /> CADocuments and Settings\Administrator\Local Settings\Temporary Internet Files\OLKB\082105 Overall List of Issues-memo.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.