My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 - Water Wastewater Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
08-02-2005 Council Meeting
>
09 - Water Wastewater Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2016 9:09:23 AM
Creation date
7/15/2016 1:40:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f <br /> City of Pequot lakes <br /> Monthly water wastewater report <br /> Date: July 28 , 2005 <br /> Month: July , 2005 <br /> Waterplant: All is working fine. Still waiting on transducer for <br /> replacement. The 2005 lead and copper monitoring results are <br /> back, all test are compliant. [see enclosed report]. <br /> Ponds/blowers: Ponds are at normal levels. One crop has been cut <br /> and removed so far, another crop is ready to be cut. <br /> �. Last month we discharged 1.7 MG on to the spray irrigation site. <br /> Fire hydrants: All good. <br /> Lift stations: Lift station # 2 had float problem, this item has been <br /> repaired <br /> Sanitary sewer: Jetted 7,516 feet of sewer main this month. <br /> General comments: Received MPCA award for 2004. A special <br /> thanks to all city employees for their great TEAM EFFORT! <br /> I went to the onsite septic seminar in Waseca, this was very <br /> informative and interesting, I learned a lot. <br /> Budget is going well, I will meet with my liason to go over the <br /> budgets of water/wastewater before the entire city council meets. <br /> Their were 2 water / sewer hookups this month. <br />
The URL can be used to link to this page
Your browser does not support the video tag.