Laserfiche WebLink
Pequot Lakes -Hwy 371 North <br /> July 19, 2005 <br /> Page 5 of 12 <br /> onto TH 371, and then wanting to get into a right-off onto West Woodman will have to <br /> weave across lanes within two blocks—not as safe a maneuver as MnDOT would want to <br /> promote. <br /> The Committee wants more MnDOT consideration of this right-in for West Woodman <br /> Street (no right-out). <br /> Northbound at East Woodman Street: With the Trailside Building and parking lot off of <br /> East Woodman Street, the Committee favored a right-in only(no right-out) at this location. <br /> From MnDOT's latest layout, it did not appear such an additional right-turn lane would <br /> impact/overlap with the proposed right-turn lane for CSAH 11/main Street. <br /> MnDOT has indicated that it will probably allow this access. <br /> Northbound at East Sibley Street: The Committee dropped this request after review of <br /> MnDOT's latest layout in the area. This layout includes a right-in right-out intersection at <br /> Jokela Street on the east side of TH 371 as well as a backage road connecting to <br /> Government Drive to form a continuous backage/frontage road. <br /> The Committee supports the layout in this area. <br /> 36. The possibility of looking at a relocation of CSAH 11 south to align with the present East <br /> Woodman Street or with the present Morehouse Drive has been suggested and reviewed. <br /> The County has said that when it comes to relocating a County State Aid Highway(CSAH), <br /> historically,the County has responded only when the City initiates it. A study needs to be <br /> done first and the County generally participates in its cost. <br /> The Committee reviewed relocation options and considered a number of factors including: <br /> right-of-way costs, existing buildings,terrain, traffic signal spacing, and traffic patterns. <br /> From the TH 371 /Morehouse Drive intersection,the "new" CSAH 11 is proposed to <br /> proceed east along Morehouse Drive to the northeast corner of the Industrial Park. It would <br /> then continue north and east to connect back into the present CSAH 11. <br /> This alignment is recommended by the Committee, although it is also recommended that <br /> construction of this realignment be delayed until some time after the completion of the TH <br /> 371 project. The Committee recommends that the City take actions to identify and preserve <br /> a corridor along this general route for such a time when construction of this realignment is <br /> desired. <br /> JAI30PQLAK\025-MnDOT TH371 Improvements\Meetings\071905 Council Workshop update-memo.doc <br />