My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.01 - Government Drive Proposal
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
07-05-2005 Council Meeting
>
10.01 - Government Drive Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2016 1:01:26 PM
Creation date
7/15/2016 1:01:25 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
July 5, 2005 " * * DRAFT' * ' <br /> The Honorable Mayor and City Council <br /> City of Pequot Lakes <br /> 409 Government Drive, P.O. Box 361 <br /> Pequot Lakes, MN 56472-0361 <br /> RE: Engineering Services Proposal <br /> Government Drive Improvements <br /> Dear Mayor and Members of the Council: <br /> The City of Pequot Lakes is considering reconstructing Government Drive from East Woodman <br /> Street on the south, across County State Aid Highway (CSAH) 11/Main Street, to East Grove <br /> Street on the north. <br /> We have used East Grove Street instead of East Sibley Street for the northern terminus to <br /> match in better with the Minnesota Department of Transportation's (MnDOT's) proposed service <br /> road system that corresponds with their proposed 4-lane Trunk Highway (TH) 371 <br /> improvements. <br /> Following is a suggested layout of improvements. We suggest this list be reviewed and agreed <br /> to by the City Council, City staff, the Planning & Zoning Commission, and the Park Board so that <br /> these improvements mesh with as many of the possible functions for this corridor as possible. <br /> Some of those functions are as follows: <br /> • Access to and parking for businesses. <br /> • Fit well with and possibly supplement the adjacent Paul Bunyan Trail, the City's Trailside <br /> Park, and the Chamber of Commerce's Trailside Building. <br /> • Operate, in some respects, as a parallel service road and possible thru route for the <br /> future 4-lane TH 371 <br /> Having said the above, the review and discussion on the improvements that will meet these and <br /> other functions will not result in pleasing everyone—the Council will have to make a decision on <br /> the scope so that we can estimate our effort. <br /> Our suggested layout of improvements is as followed (numbered for ease of reference, not in <br /> any order of rank): <br /> 1. There is not watermain under Government Drive from East Oriole Street to East Sibley <br /> Street. <br /> Install new 6-inch diameter watermain with service stubs so the system is looped better. <br /> `' Costs to be paid for from the City Water"enterprise" fund. <br />
The URL can be used to link to this page
Your browser does not support the video tag.