Laserfiche WebLink
City of Pequot lakes <br /> Monthly water wastewater report <br /> Date: June 30, 2005 <br /> Month: Reporting for June, 2005 <br /> Waterplant:Working on the replacement of pressure transducer <br /> for the backwash recirculation basin, cost of the transducer is <br /> 770.00$. Will replace within. <br /> Ponds/blowers: Discharged 2.5 MG for the month of May, on to <br /> the spray irrigation site. Pond levels are normal. <br /> Fire hydrants: All good, received another bid for replacement of <br /> the hydrant on Govt. Dr. Request acceptance of bid from Toms <br /> backhoe to replace hydrant this fall at a cost of$ 5,100. Young bid <br /> was $ 59762. <br /> Lift stations: All working fine. <br /> Sanitary sewer: Discovered sewer force main to ponds had a <br /> break on June 21, repaired with sleeve. Total time was approx. 3 <br /> hours. <br /> Jetted approx. 5,500 feet of sewer main this month. <br /> General comments: Completed federally mandated lead and <br /> copper sampling regime. No test results yet. <br /> Consumer confidence report for 2004 is completed. <br /> �., Still waiting on sewer main replacement costs for Main Street. <br />