Laserfiche WebLink
City of Pequot lakes <br /> Monthly water wastewater report <br /> Date: April 26 , 2005 <br /> Month: Report for March,2005 <br /> Waterplant: All is working good, no problems. <br /> Ponds/blowers: Their still was a slight odor problem this month, but since then has <br /> dimminshed <br /> �.. Fire hydrants: All hydrants have been flushed for the spring. No complaints from <br /> the public. <br /> Lift stations: All lift stations have had their bi-annual maintaince completed. All <br /> lifts are in good working order. <br /> Sanitary sewer: Still working on the sewer back ups in march. Waiting to hear <br /> from the insurance adjuster on the David Anderson home on what is going to be paid. <br /> Also waiting to here from Infratec on their recommendations for repair on the line next to <br /> Pestellows and the sewer line on north heath street. <br /> General comments: The water and sewer extension in the industrial park seems to <br /> be on schedule. The vacume machine we were looking at has been turned down by <br /> Crosslake city council, so it looks like this is a dead issue. The spray irrigation site is <br /> ready for discharging of the wastewater effluent. Waiting for a better cover of grasses, <br /> will start discharging around the first part of May. Looking into the replacement of the <br /> fire hydrant in front of Pfeiffer drug, still waiting on several bids. Cost should be <br /> approximately 5,0000.00. This hydrant is in dire need of replacment due to age, lack of <br /> draiirig down properly, which causes problem in the winter months. <br />