My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.02 - Environmental Assessment Over-Flight Proposal
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2005
>
03-01-2005 Council Meeting
>
05.02 - Environmental Assessment Over-Flight Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2016 10:18:43 AM
Creation date
7/12/2016 3:27:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d. A thermal image of the detected area .� <br /> e. A water penetrating image of the detected area <br /> £ A detailed comment section with an analysis of each detected site with <br /> recommendations for ground truth confirmation,and for best management <br /> practices if problems are confirmed. This analysis section will assist in <br /> prioritizing the detected sites and identifying those sites in need ofthe most <br /> immediate attention <br /> £ A conclusion and recommendation section in the final report will <br /> the findings of the analysis,and provide diection for fidure site management <br /> activities <br /> g. An oral presentation to the sponsoring agencies and any other individuals the <br /> agencies wish to inchrde <br /> IL Statistical summary of potential influences <br /> Financial Section <br /> The total cost of the project as specified in this bid will be submitted to the City of Pequot <br /> Lakes and will include one copy of thefinal report and all the original image data The <br /> agency will then contact A. W. Research Laboratories, Inc. to plan a presentation of the <br /> information collected <br /> Environmental Study <br /> Total cost of Overflight $1,746.00 <br /> Amount due on acceptance of proposal:- $ 873.00 <br /> Amount due after receiving the final report S 873.00 <br /> $1,746.00 <br /> General <br /> If not authorized within 90 days past the date of this proposal, w reserve the right to <br /> modify our costs This proposal and all information contained herein is supplied <br /> expressly for the evaluation of the City of Pequot Lakes representatives, and shall not be <br /> released to, or implemented by, any third party without the approval of AWRL. Please <br /> sign and return the accompanying contract as our Notice To Proceed <br /> Flight Schedule <br /> The optimum time for collecting the data will be October-December 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.