My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08 - Fire Department Monthly Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
12-04-2006 Council Meeting
>
08 - Fire Department Monthly Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2016 8:02:54 AM
Creation date
7/12/2016 8:02:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WIDSETH SMITH NOLTING <br /> FEE SCHEDULE <br /> January 1, 2006 <br /> Principal.................................................................. $ 135.00/hr <br /> Engineer V,Architect V, <br /> Land Surveyor V, Scientist V................................... $ 125.00/hr <br /> Engineer IV,Architect IV, <br /> Land Surveyor IV, Scientist IV................................. $ 115.00/hr <br /> Engineer III,Architect III, <br /> Land Surveyor III, Scientist III................................. $ 99.00/hr <br /> Engineer II,Architect II, <br /> Land Surveyor II, Scientist II................................... $ 83.00/hr <br /> Engineer I,Architect I, <br /> Land Surveyor I, Scientist I..................................... $ 68.00/hr <br /> Computer Systems Specialist........................................ $ 99.00/hr <br /> TechnicianV............................................................ $ 85.00/hr <br /> TechnicianIV........................................................... $ 78.00/hr <br /> Technician III........................................................... $ 65.00/hr <br /> Technician II............................................................ $ 54.001hr <br /> Technician I............................................................. $ 41.00/hr <br /> Administrative Assistant............................................. $ 39.00/hr <br /> Mileage................................................................... $ 0.45/mile <br /> Meals/Lodging........................................................... Cost <br /> Stakes & Expandable Materials..................................... Cost <br /> WasteWater Sampler................................................. $ 40.00/day <br /> ISCO Flow Recorder.................................................. $ 60.00/day <br /> Photoionization Detection Meter................................... $ 80.00/day <br /> Explosimeter............................................................ $ 50.00/day <br /> Product Recovery Equipment....................................... $ 35.00/hr <br /> Global Positioning System (GPS)................................... $ 600.00/day <br /> Soil Drilling Rig ....................................................... $ 35.00/hr <br /> Groundwater Sampling Equipment............................... $ 75.00/day <br /> Subcontractors......................................................... Cost <br /> All accounts due and payable within 30 days of billing.A finance charge is computed on a <br /> periodic rate of 1%per month which is an annual percentage rate of 12% on any previous <br /> balance not paid within 30 days. <br /> These rates are effective only the year indicated and are subject to yearly adjustments which <br /> reflect equitable changes in the various components. <br />
The URL can be used to link to this page
Your browser does not support the video tag.