Laserfiche WebLink
C. The action or inaction of the City shall not constitute a waiver or <br /> amendment to the provisions of this Agreement. To be binding, <br /> amendments or waivers shall be in writing,signed by the parties, and <br /> approved by written resolution of the City Council. The City's failure to <br /> promptly take legal action to enforce this Agreement shall not be a waiver <br /> or release. <br /> D. This Agreement shall run with the Property and shall be binding upon the <br /> Developer, it successors and assigns. The Developer may, at its <br /> expense, record this Agreement in the office of the County Recorder. <br /> After the Developer has completed the work required under this <br /> Agreement, at the Developer's request the City will execute and deliver to <br /> Developer a release in recordable form. <br /> E. All parties to this Agreement acknowledge they have been represented by <br /> counsel and have entered into this Agreement freely and voluntarily. <br /> F. Planning Commission and City Council Conditions of Approval. All <br /> conditions of approval by the Planning Commission and City Council are <br /> incorporated herein by reference. <br /> G. Sewer Lift Station. The Developer shall construct a sanitary sewer lift <br /> station, the location of which is identified on the Final Plat, as well as <br /> wastewater infrastructure within the Plat, pursuant to specifications and <br /> standards established by the City, for which the City will accept as a public <br /> utility. Said lift station shall be constructed according to plans and <br /> specifications approved by the City and based upon a satisfactory <br /> inspection by the City Engineer, said lift station will be accepted for <br /> maintenance by the City. In addition the Developer agrees to convey a <br /> permanent easement to the City for the location of the lift station. <br /> H. In constderatlon for the rnstallatt `n of the rrrumctpal water ands rigarji <br /> sewerinfrastructure Wrthrn + P[at �#heD �eloperr iU ing o , sized <br /> pipe ar tt the llftsfatlon ,Which infra iuctt a port cp Iak v�nl �e <br /> accp ed by t �ECtty'as a b(tc uttl ,tht#y1as ages value water~ <br /> acca charged sewer�access c atgesrtn motrn ..... <br /> �l��� `�� � -;=eontlttiotiec�upvn the foUo�+ing <br /> • The Developer must meet all requirements of this Agreement; and <br /> The Developer has agreed to install and/or incur the following: <br /> • The cost difference between a 6-inch and 10-inch diameter watermain(estimated to be$8 per <br /> foot)along Councy Road 112,consisting of approximately 700 feet. <br /> • The cost for the gravity sanitary sewer under Trailside Road from Trailside Loop to County Road <br /> 112(approximately 300 feet)including a manhole in County Road 112 and necessary pavement <br /> replacement and Work Zone Traffic Control. <br /> • The cost for 50%of the lift station and force main installation. <br /> 15 <br />