My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02 - MPCA - Spray Irrigation Fields
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
09-20-2006 Special Council Meeting
>
02 - MPCA - Spray Irrigation Fields
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 9:07:30 AM
Creation date
7/8/2016 9:07:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7077.0272 FACILITIES PLAN FOR WASTEWATER TREATMENT SYSTEMS <br /> Subpart 1. In general. Facilities plans for wastewater treatment systems must be prepared <br /> and signed by a professional engineer registered in Minnesota, provided that facilities plans for <br /> individual sewage treatment systems designed to treat 5,000 gallons or less of wastewater per <br /> day must be prepared and signed by either a professional engineer registered in Minnesota or an <br /> individual sewage treatment system designer authorized under agency rules to prepare such <br /> plans. <br /> Subp. 1a. Approval by commissioner. Facilities plans must be submitted to the <br /> commissioner for review and approval. Approval shall be based on the commissioner's <br /> determination of the adequacy of the facility plan to address the requirements of this part. If the <br /> municipality is proposing to change the selected treatment method or any other major element of <br /> a previously approved facilities plan or storm water project plan, the municipality must receive the <br /> commissioner's approval of a facilities plan addendum. <br /> Subp. 2. Facilities plan contents. A facilities plan must address items A to E in the amount <br /> of detail that is appropriate to describe a project accurately. <br /> A. A complete description and evaluation of the existing wastewater treatment system and <br /> problems that need correction. This evaluation must consider the age, condition, design capacity, <br /> and treatment capabilities of each treatment unit, the system's ability to meet current or proposed <br /> permit requirements, and the location, frequency, and quantity of any bypasses. For existing <br /> individual sewage treatment systems, a survey must also be prepared which identifies whether or <br /> not each individual sewage treatment system in the project service area conforms to the <br /> requirements under chapter 7080. <br /> B. Data describing existing residential wastewater flows and loadings, and existing <br /> nonresidential wastewater flows and loadings. The existing wastewater flow and loading data <br /> must be reported on a form provided by the agency. <br /> C. Data describing future residential and nonresidential wastewater flows and loadings within <br /> the next 20-year period based on projected residential growth, projected nonresidential growth, <br /> and signed letters of intent from significant industrial users. The future wastewater flow and <br /> loading data must be reported on a form provided by the agency. <br /> D. An analysis of all feasible treatment alternatives that are capable of meeting the applicable <br /> effluent, water quality, and public health requirements for 20 years. Where the project area is <br /> currently served by individual sewage treatment systems, the analysis of feasible treatment <br /> alternatives must be submitted on a form prescribed by the commissioner. The discussion of the <br /> considered alternatives must include: <br /> (1) a comparison of the cost-effectiveness of the alternatives considered. The comparison <br /> must include a detailed breakdown of the present worth of all capital costs, annual operation and <br /> maintenance costs, equipment replacement costs, and salvage values. If excessive levels of <br /> infiltration or inflow exist, the comparison of treatment alternatives must include a comparison of <br /> the cost of eliminating excessive infiltration or inflow with the cost of transportation and treatment <br /> of the infiltration or inflow; <br /> (2) a site assessment of the existing soil and groundwater conditions conducted and signed <br /> by a professional engineer. For individual sewage treatment systems designed to treat less than <br /> 5,000 gallons per day of wastewater, a site assessment must be done by either a professional <br /> engineer or an individual sewage treatment system designer authorized under agency rules to <br /> make the assessment; <br /> (3)an evaluation of the impact of the alternatives on all existing wastewater treatment <br /> systems, including sewers and lift stations; <br /> Page 1 of 3 <br /> CADocuments and Settings\Sandy\Local Settings\Temporary Intemet Files\OLK23\MN Rule 7077 0272-Facilities <br /> Plan Requirements.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.