Laserfiche WebLink
CITY OF PEQUOT LAKES <br /> `- MONTHLY WATER/WASTEWATER REPORT <br /> MONTH OF: June, 2006 <br /> DATE: June 26, 2006 <br /> WATERPLANT: Chlorinator in chemical room had bad valve, <br /> replaced. Also had chlorine leak in the outside chlorine room had <br /> to call 911 and the fire Dept to ventilate the building. Sent in the <br /> manifold for repairs. <br /> WATER DISTRUBITION: Exercising gate valves, 1 leaking on <br /> Govt. Dr. Inspected and exercised, no problem with it leaking. <br /> Replaced the water meter at Pequot Family Clinic. It now has a <br /> auto read meter. Repaired broken curb stop at the Sandelin law <br /> office Bldg. <br /> WASTEWATER: All is good. The Irrigators are working well. <br /> Last months wastewater application to the spray site was 5.7 MG. <br /> The firs crop was cut from the spray site on June 16. Still looking <br /> at the repairs to the air diffusers lines as soon as the pond levels are <br /> at an acceptable level. <br /> SANITARY SEWER: Three sewer backups. None due to cities <br /> main. [See enclosed reports]. Homeowners all had tree root <br /> problems. Jetted sewers, approx. 90% of west side complete. <br />