My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.01-06.06 - Rezoning from Forestry to Agriculture, Rezoning from Forestry to Agriculture and Forest Management, Preliminary Plat, Final PLat, Conditional Use of Permit, Preliminary Plat of Tall TImbers
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
05-02-2006 Council Meeting
>
06.01-06.06 - Rezoning from Forestry to Agriculture, Rezoning from Forestry to Agriculture and Forest Management, Preliminary Plat, Final PLat, Conditional Use of Permit, Preliminary Plat of Tall TImbers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2016 12:27:13 PM
Creation date
7/1/2016 3:50:21 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ii. Mechanism for the maintenance of open space areas. <br /> b. Revisions shall be made to the documents to the satisfaction of the City Attorney. <br /> c. Once acceptable to the City Attorney, the documents shall be reviewed by the <br /> Planning Commission. Revisions shall be made to address any Planning <br /> Commission concerns. <br /> d. Once Planning Commission concerns have been addressed, the Planning <br /> Commission shall approve the documents and they shall become the controlling <br /> documents for the development. <br /> 3. Prior to submission of a final plat application,the applicant shall provide a calculation of <br /> the projected impervious coverage. This amount shall comply with the underlying <br /> zoning requirements. Based on the percentage provided, the City Engineer shall <br /> determine the frequency and intensity of storm to be retained on site. This design shall <br /> be provided as part of the stormwater pollution and prevention plan. <br /> 4. Prior to the submission of a final plat application, the applicant shall submit a <br /> stormwater pollution and prevention plan for the property. This plan shall be reviewed <br /> and approved by the City Engineer. <br /> a. The provisions of this plan shall be fully implemented, and the following shall be <br /> abided by: <br /> L Erosion control devices shall be in places prior to the commencement of <br /> any construction. <br /> ii. Following the placement of the erosion control devices,but a minimum of <br /> 48 hours prior to any construction or grading on the site,the City shall be <br /> contacted to perform an inspection of the devices. <br /> iii. Upon inspection by the City, any deficiencies shall be corrected prior to <br /> grading or construction. <br /> iv. Following each rainfall event during construction, erosion control devices <br /> shall be inspected by the developer or a developer's representative on site. <br /> The inspection shall be documented in an inspection log, with any <br /> deficiencies and corrective actions noted. A copy of this log shall be <br /> provided to the City on a monthly basis throughout the construction <br /> process. <br /> 5. Additional screening shall be provided along County Road 112 within Outlot A to provide <br /> a buffer between the traveled roadway and the development. The buffer it to assist in <br /> retaining the rural character of the roadway and shall ultimately provide for 75% <br /> screening of the structures,during leaf-on conditions,as viewed from the roadway. <br /> 6. Prior to submission of a final plat application,the following shall occur: <br /> a. The applicant shall submit information showing designs for construction of the <br /> roadways and extension of the municipal sewer and water systems. <br /> b. The designs shall be reviewed by the City Engineer. Revisions to the plans shall <br /> be made to the satisfaction of the City Engineer. <br /> c. Once acceptable to the City Engineer,the designs shall be reviewed by the <br /> Planning Commission. Revisions shall be made to address Planning Commission <br /> concerns. <br /> d. Once Planning Commission member's concerns have been addressed,the <br /> Planning Commission shall approve the design and it shall become a controlling <br /> document for the development. <br /> 7. The applicant shall prepare a developer's agreement for review by the City Attorney. The <br /> agreement shall outline mechanisms and securities for ensuring that requirement <br /> improvements are completed. <br /> 8. The applicant shall be responsible for all expenses that the City incurs in administering <br /> 14084 Baxter Drive, Suite 7 <br /> Baxter, MN 56425 <br /> (218) 828-3064 <br /> www.communitygrowth.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.