My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05.03 - Park Board Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2006
>
05-02-2006 Council Meeting
>
05.03 - Park Board Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2016 2:06:42 PM
Creation date
7/1/2016 3:45:01 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ABEAR'S PEOUOT SAND AND GRAVEL <br /> Inside Walking Path - $10,625 <br /> Includes black dirt, spreading dirt, and sprinkler system <br /> Hydro Seed- $3,600 <br /> North End of Park- $2,996 <br /> South End of Park- $1,315 <br /> TOTAL $18,536 <br /> We've added the north and south ends of the park. This bid includes black dirt, spreading, <br /> hydroseed,rainbird sprinkler heads plus 52' 6"rock creek bed on north end. <br /> Advantages <br /> 1) Grass is guaranteed <br /> 2) 100% coverage from head to head on the sprinkler system <br /> 3) The bonus of the rock bed on the north end to eliminate the soil erosion from the <br /> draining water <br /> 4) One company to deal with rather than three companies (not enough black dirt,not <br /> enough sprinklers, etc.) <br /> COMPARISON <br /> Rainbow Sprinkler System- $9273 <br /> Acorn Black Dirt- $5,000 <br /> Delivery/Grading - $4,000 <br /> Another Company—Hydroseed- $5,000 <br /> Rock Bed $1,000 <br /> TOTAL $24,273 <br /> Disadvantage— <br /> 1) Higher cost <br /> 2) Three companies to deal with rather than one <br />
The URL can be used to link to this page
Your browser does not support the video tag.